The Basic Search
Enter one or more search terms (the words or phrase that best describe the information you want to find) into the search box and press the Search key.

Automatic "AND" Searches
By default, the search will return pages that include all of your search terms. There is no need to include "AND" between terms.
 Word 1 Word 2
(example)


Phrase Searches
You can search for phrases by adding quotation marks. Words enclosed in double quotes ("like this") appear together in all returned documents. Phrase searches using quotation marks are useful when searching for specific titles or names.
 "Word 1 Word 2"
(example)


"OR" Searches
To retrieve pages that include either word 1 or word 2, use an uppercase "OR" between terms. For example, to search for either Word 1 or Word 2, enter:
 Word 1 OR Word 2
(example)


Excluding Words
You can exclude a word from your search by putting a minus sign ("-") immediately in front of the term you want to exclude. Make sure you include a space before the minus sign.
 Word1 -Word 2
(example)

Select one or more criteria to filter by:
Filters

Showing 106-120 of 225 Decision Points filtered by: State (Active)

Decision Points
ID  Sort Ascending Decision Point Name   Primary Roadmap   Tgt CY Date   Priority   Planning  
726 Initial Investment Decision (IID) for Alternate Positioning, Navigation and Timing (APNT) Navigation 2016 Q4 High No
727 Final Investment Decision (FID) for Alternate Positioning, Navigation and Timing (APNT) Navigation 2017 Q4 High No
759 Strategy decision on direction of oceanic and offshore platforms including sustainment, termination, migration, and consolidation Automation 2014 Q3 No
760 Concept and Requirements Definition Readiness (CRDR) for ECG Automation 2015 Q2 Yes
771 Strategy Decision to incorporate Wake Turbulence system functions & wake procedures into en route automation programs Airspace and Procedures 2018 Q4 Yes
772 Decision to incorporate Wake Re-Categorization (Phase 2) into 7110.65 Airspace and Procedures 2016 Q1 Yes
773 Decision to incorporate Wake Re-Categorization (Phase 3) into 7110.65 Airspace and Procedures 2020 Q1 Yes
774 Decision to incorporate CSPR-specific Wake Turbulence Mitigation for Arrival Procedures into 7110.65 or other order prescribing air traffic control procedures Airspace and Procedures 2014 Q2 No
775 Decision to incorporate En Route Wake Avoidance procedures into 7110.65 or other order prescribing air traffic control procedures Airspace and Procedures 2015 Q4 Yes
778 Initial Investment Decision (IID) for FTI-2 program Communications 2018 Q2 High No
783 Final Investment Decision (FID) for RCOM Communications 2014 Q2 No
784 Final Investment Decision (FID) for NEXCOM Segment 2 Phase 2 in remaining Terminal and Flight Service areas Communications 2017 Q2 Yes
785 Final Investment Decision (FID) for Data Communications Segment 1 Phase 2 En Route Services Communications 2014 Q4 High No
787 Strategy decision based on the Usage and Operation analysis to determine the long term Aircraft Access to SWIM (AAtS) strategy. Enterprise Services 2016 Q1 Yes
801 Investment Analysis Readiness Decision (IARD) for technology refresh of beacons (ATCBI-6) Surveillance 2016 Q2 No
Showing 106-120 of 225 Decision Points filtered by: State (Active)


U.S. Department of Transportation
Federal Aviation Administration
800 Independence Avenue, SW
Washington, DC 20591
1-866-TELL-FAA (1-866-835-5322)